johnka37 johnka37
  • 24-05-2018
  • Mathematics
contestada

If a job can be completed in 4 hr, then the rate of work is __ of the job per hour.

Relax

Respuesta :

hhong2021 hhong2021
  • 24-05-2018
1 divided by 4 is 0.25 or 1/4
Answer Link
mmpeachey107
mmpeachey107 mmpeachey107
  • 24-05-2018
To find the rate of work, split up the hour by 4. So, 1 divided by 4.  This makes .25 (also written as 1/4).  So the rate of work is 1/4 of the job per hour.

Hope this helps! Can I have Brainliest? :)

Answer Link

Otras preguntas

When a scientist is conducting research about all the plants and wildlife in the Mojave Desert as well as the desert's resources, such as water and soil, the sc
gradient if u good hhhhhhhhh
What is the highest point in a particular section of a graph.
Which event started the Korean War?
What is a functional region
Two positive integers have a product of 50. One integers is twice the other. What are the integers?
a separation of powers refers to​
What is another name for a relation that has each element in its domain paired with exactly one element in its range?
A race car goes around a level, circular track with a diameter of 1.00 km at a constant speed of 89 km/h. What is the car's centripetal acceleration in m/s^2?
what was the purpose of the thirteenth amendment?