kobiemaltie13 kobiemaltie13
  • 23-09-2020
  • Engineering
contestada

The process of hazard recognition, evaluation, and control is the foundation of an effective___program.
a safety
b work
c training
d job mentoring

Relax

Respuesta :

Milkpatty Milkpatty
  • 23-09-2020
Answer: A. Safety program
Answer Link

Otras preguntas

How much heat is required to warm 230 g of water from 12°C to 90°C? (Specific Heat of Water = 4.184)
a van moves at a constant speed of 4 miles per hour. How long would it take to travel a distance of 100 miles?
Where is the genetic information stored in mice?​
A piano teacher has 4\dfrac124 2 1 ​ 4, start fraction, 1, divided by, 2, end fraction hours available to teach in a night. Each lesson will last 1\dfrac121 2 1
The answer to this question.
I’m to lazy to do this myself so I’m gonna ask y’all for help
I need helpppppppppppppp
Find the slope of the line that passes through (2, 6) and (-7, 8)
WILL MARK ANYONE WHO ANSWERS RIGHT THE BRAINLEST AND YOU GET 30 POINTS Use the model to solve for x. Three blue tiles, each with X inside, plus two blue tiles,
Westward expansion led to a marked increase in A: deaths by cholera and other diseases B: conflicts between the American and British armies C: immigration from