katianCarlanaj
katianCarlanaj katianCarlanaj
  • 21-11-2015
  • Chemistry
contestada

Which of the following is considered a major process flow structure?
a. Lean Manufacturing
b. Project
c. Fabrication
d. Lead Time

Relax

Respuesta :

frontloader13 frontloader13
  • 22-11-2015
Since lead time is the time period between the starting and completion of producing a product, lead time is a major process flow structure.
Answer Link

Otras preguntas

What common character trait do tragic heroes share?
10 to the power of 5 times 10 to the power of 8?
A store sells T-shirts $10 each and jeans for $20 a pair. Anna spends $150 for T-shirts and jeans. she buys x T-shirts and y pairs of jeans. what is the equatio
What common character trait do tragic heroes share?
6^2/2(3)+4= what is the answer
what area of the long bone is covered for cartilage
Factor completely. 3x3 – 12x a. 3x(x – 2)(x – 2) b. 3x(x + 2)(x – 2) c. 3(x + 2)(x – 2) d. 3x(x – 4)
One of the main ideas of economics is that every choice made involves a cost
Which type of organism is the simplest? A. Sponges B. Chordates C. Vertebrates D. Deuterostomes
menos / de / mateo y paco / el grupo / alto / ser / los